The construction of this project includes the excavation, dewatering, necessary shoring, grating, yard piping, wet well and dry pit concrete structures; Building construction including concrete, CMU, plumbing, electrical, and HVAC, piping, and standby generator; dry-pit submersible pump station, including suction and discharge piping and instrumentation; and site improvement including pavement, driveway, drainage improvement, and perimeter fencing with access gate. Splitter box, pump station dry pit, and wet wells will be constructed of the cast in place concrete. The electric building will be constructed of CMU and will be the only above-ground structure. Construction will include installing (3) pumps in this phase while allowing for the future.