The Spanish Fork Santaquin Pipeline – Santaquin Reach project will include electrical work at the Payson East Turnout, Santaquin North Turnout, and Santaquin South/Pigging Structure. The electrical scope will include utility service equipment, panelboards, power and control conduit, grounding, lighting, and connections for equipment throughout the facilities.
The project will also include duplex sump pump control panels, RTU and PLC equipment, wet-location lighting and switches, emergency lighting, and electrical provisions for future security equipment. Utility service will be coordinated with the serving power companies at the different sites.
Instrumentation and control systems will support monitoring and operation of the turnout facilities. The drawings include fiber connections, sump pump monitoring, intrusion switches, temperature monitoring, and other control signals used to communicate with the facility control systems.
Together, these improvements will provide the electrical power, lighting, controls, monitoring, and communication systems needed to support reliable operation of the three turnout facilities.
The South Salt Lake Sewer Lift project will include electrical work to support the power, control, instrumentation, and operation of the sewer lift facility. The electrical scope will include a complete power distribution system along with the raceways, conductors, connections, and supporting equipment required for the facility. Electrical Specifications
A new 480/277-volt, three-phase electrical service will provide power to the facility. The work will include electrical distribution equipment, panelboards, control equipment, grounding, conduit, wiring, and connections to equipment throughout the project. Electrical Specifications
Variable frequency drives will also be included to provide adjustable control of connected motors. The VFD systems will provide motor control, monitoring, fault protection, and communication capabilities with the PLC and SCADA systems. Electrical Specifications
The project will also include a 600 kW diesel standby generator rated at 480/277 volts. The generator system will provide emergency electrical power if normal utility power is lost. An automatic transfer switch will allow the electrical system to automatically transfer to generator power during an outage and return to normal utility power once service is restored. Electrical Specifications Electrical Specifications
Control panels and instrumentation will help monitor and operate equipment throughout the facility. Electrical work will also include connections for mechanical and control equipment, along with the wiring and devices required for the building’s electrical and control systems. Electrical Specifications
Once complete, the electrical systems will provide the power distribution, motor control, monitoring, and emergency power infrastructure needed to support reliable operation of the South Salt Lake Sewer Lift facility.
The CUWCD CWP Well Houses #7, 16, 17 project includes electrical work supporting three high-head well pump houses for the Central Utah Water Conservancy District. The electrical systems provide power, control, monitoring, and backup power for the well facilities.
The electrical scope includes conductors, raceways, grounding and bonding, electrical system analysis, and power measurement and control equipment. The project also includes medium-voltage equipment such as pad-mounted transformers, fused switches, surge protection, and adjustable frequency drives. Electrical Specifications Bid S…
Additional work includes low-voltage transformers, panelboards, motor controls, wiring devices, lighting, diesel generators, and automatic transfer switches. These systems support the pumps and other equipment throughout the three facilities. Electrical Specifications Bid S…
The project also includes electrical service work such as underground duct systems, transformer pad preparation, metering equipment, conduit, and secondary electrical service connections. Electrical Specifications Bid S…
Monitoring and control equipment includes level switches, pressure switches, and door and hatch position switches for Wells #7, #16, and #17. Well #16 also includes electrical monitoring and alarm equipment associated with the chlorine room. Electrical Specifications Bid S…
Together, these improvements provide the electrical infrastructure needed to support the operation of all three CWP well houses.
The Ashley Valley WTP Backwash Recovery Building Rehabilitation project will include electrical upgrades to support improvements throughout the existing backwash recovery facility. The electrical work will include replacing conductors serving pumps, decant valves, and sluice gates while reusing existing conduit where possible. Specifications
The project will also include replacing control conductors between the existing backwash panel, decant valves, and sluice gates. New grounding conductors and electrical connections will be installed to support the upgraded equipment and control systems. Specifications
Additional work will include a new light and switch in the sluice gate room, along with new conduit, wiring, and a breaker in the existing lighting panel. Flexible conduit at pumps, valves, and gates will also be replaced where conductors are being upgraded. Specifications
The project will also repair deteriorated electrical conduit serving the pumps. Existing corroded conduit will be removed and replaced with new PVC-coated rigid metal conduit and connected back to the existing disconnect switches. This work will help improve the reliability of the electrical systems supporting the backwash recovery building.
The Orem WRF Tertiary Reuse Project included extensive electrical work to support upgrades at the City of Orem Water Reclamation Facility. The electrical scope included power distribution, grounding, lighting, controls, instrumentation, fire alarm systems, lightning protection, and connections for equipment throughout the facility. Volume 1 Electrical Specificati…
The project also included conduit, wiring, and electrical connections for motors, motor controllers, control panels, and field-mounted instruments. Variable frequency drives, transformers, harmonic filters, and other supporting electrical equipment were installed and connected as part of the new systems. Volume 1 Electrical Specificati… Volume 1 Electrical Specificati…
Additional electrical work included modifications to existing control systems, underground raceways, manholes, handholes, lighting systems, and power distribution equipment. Crews also completed electrical demolition and relocation work where existing equipment had to be removed or moved to support the facility improvements. Volume 1 Electrical Specificati… Volume 1 Electrical Specificati…
Testing and startup were completed to verify that the new electrical systems operated correctly. The work was carefully coordinated with the existing treatment plant so the facility could remain operational during construction.
The Quail Creek WTP Phase 3 project will include major electrical upgrades to support the plant expansion and ozone addition. The work will include new switchgear, generators, motor control equipment, variable frequency drives, transformers, panelboards, conduit, cable tray, wiring, lighting, grounding, and fire alarm systems throughout the facility.
The project will also include modifications to existing electrical equipment so the new systems can work properly with the plant’s current infrastructure. Crews will install new underground and aboveground raceways, electrical boxes, manholes, handholes, conductors, and other supporting electrical equipment needed for the expansion.
Motor control equipment and variable frequency drives will help provide reliable operation and control for equipment throughout the plant. New power distribution equipment will also support the additional electrical loads created by the expansion and ozone systems.
Testing and coordination will be an important part of the Quail Creek WTP Phase 3 project. Electrical equipment will be tested and checked before startup to confirm that the systems are operating correctly and safely.
Because the water treatment plant will remain in operation during construction, the electrical work will need to be carefully coordinated with the existing facility. Shutdowns, equipment changes, and testing will be planned around plant operations to help reduce interruptions while the new electrical systems are installed and brought online.
The South Valley WWRF Electrical MCC Replacement project will include upgrades to the existing motor control center and related electrical equipment. The work will include replacing four reduced-voltage solid-state motor starters in the existing HW-MCC-C and installing new ABB equipment to match the current MCC. 16422 RVSS Specification
The project will also include motor circuit protection, controls, wiring connections, and coordination with the existing motors and electrical system. The new starters will be installed in the existing motor control center and configured for proper operation. 16422 RVSS Specification 16422 RVSS Specification
Testing and startup will also be part of the work. The equipment will be inspected, adjusted, and tested to confirm that the controls, protection settings, and motor starter operation are working correctly before final completion. 16422 RVSS Specification
The Kent Booster Pump Station project for Granger-Hunter Improvement District includes electrical work for a new booster pump station, generator systems, controls, and telemetry wiring. Morris Electric’s work supports the electrical systems needed for the facility and its equipment. The overall project also includes new piping, site improvements, and connections to existing water tanks. This project helps support reliable water infrastructure in West Valley City, Utah.