The work consists of site demolition and removal of existing equipment, structures. Construct a building and storage area to house a new primary chemical storage tank and chemical dosing pumps adjacent to the existing headworks building. Install new secondary chemical dosing pumps in the existing belt press building. Installation of a secondary chemical dosing. Construct a new DAFT building and install owner furnished HUBER DAFT equipment package DAFT building includes a new electrical room.

 