The construction work for the sixth water flow control structure modification project, in general, consists of furnishing and installing a high pressure and high head break bypass flow control structure and reconstruction of a 87 -inch diameter tunnel access pipeline. The project primarily includes earthwork, structural, mechanical, piping, and electrical work for a new bypass flow control structure that will be connected adjacent to the existing structure. The site is constrained and located in a remote area in Sixth Water Canyon.