DFCM 13.04 Headworks

DFCM 13.04 Headworks

Construction of a screening and pressing building for the DFCM project. This will have two 175amp services With a 200 amp ATS this will feed a 480/277 vac panel. It also has two Screen Control Panel for the two controls for each Screen and Press.  

 

 

Send Us A Message