The CUWCD CWP Well Houses #7, 16, 17 project includes electrical work supporting three high-head well pump houses for the Central Utah Water Conservancy District. The electrical systems provide power, control, monitoring, and backup power for the well facilities.
The electrical scope includes conductors, raceways, grounding and bonding, electrical system analysis, and power measurement and control equipment. The project also includes medium-voltage equipment such as pad-mounted transformers, fused switches, surge protection, and adjustable frequency drives. Electrical Specifications Bid S…
Additional work includes low-voltage transformers, panelboards, motor controls, wiring devices, lighting, diesel generators, and automatic transfer switches. These systems support the pumps and other equipment throughout the three facilities. Electrical Specifications Bid S…
The project also includes electrical service work such as underground duct systems, transformer pad preparation, metering equipment, conduit, and secondary electrical service connections. Electrical Specifications Bid S…
Monitoring and control equipment includes level switches, pressure switches, and door and hatch position switches for Wells #7, #16, and #17. Well #16 also includes electrical monitoring and alarm equipment associated with the chlorine room. Electrical Specifications Bid S…
Together, these improvements provide the electrical infrastructure needed to support the operation of all three CWP well houses.