Ashley Valley WTP Backwash Recovery Building Rehabilitation
October 6th, 2026The Ashley Valley WTP Backwash Recovery Building Rehabilitation project will include electrical upgrades to support improvements throughout the existing backwash recovery facility. The electrical work will include replacing conductors serving pumps, decant valves, and sluice gates while reusing existing conduit where possible. Specifications
The project will also include replacing control conductors between the existing backwash panel, decant valves, and sluice gates. New grounding conductors and electrical connections will be installed to support the upgraded equipment and control systems. Specifications
Additional work will include a new light and switch in the sluice gate room, along with new conduit, wiring, and a breaker in the existing lighting panel. Flexible conduit at pumps, valves, and gates will also be replaced where conductors are being upgraded. Specifications
The project will also repair deteriorated electrical conduit serving the pumps. Existing corroded conduit will be removed and replaced with new PVC-coated rigid metal conduit and connected back to the existing disconnect switches. This work will help improve the reliability of the electrical systems supporting the backwash recovery building.