The Orem WRF Tertiary Reuse Project included extensive electrical work to support upgrades at the City of Orem Water Reclamation Facility. The electrical scope included power distribution, grounding, lighting, controls, instrumentation, fire alarm systems, lightning protection, and connections for equipment throughout the facility. Volume 1 Electrical Specificati…
The project also included conduit, wiring, and electrical connections for motors, motor controllers, control panels, and field-mounted instruments. Variable frequency drives, transformers, harmonic filters, and other supporting electrical equipment were installed and connected as part of the new systems. Volume 1 Electrical Specificati… Volume 1 Electrical Specificati…
Additional electrical work included modifications to existing control systems, underground raceways, manholes, handholes, lighting systems, and power distribution equipment. Crews also completed electrical demolition and relocation work where existing equipment had to be removed or moved to support the facility improvements. Volume 1 Electrical Specificati… Volume 1 Electrical Specificati…
Testing and startup were completed to verify that the new electrical systems operated correctly. The work was carefully coordinated with the existing treatment plant so the facility could remain operational during construction.