The 3600 West 10200 South Pump Station project consists of furnishing and installing the equipment, facilities, services, and appurtenances as included in these Contract Documents. The work generally consists of mobilization, bonding, insurance, labor, demolition, procurement, and installation of materials as shown on the Civil, Structural, Process, Mechanical, Electrical, and I&C drawings. The work includes installation of a new pump station including a new building, water distribution pumps, surge tank, piping and fittings, valves, piping appurtenances, HVAC equipment, restroom, drains and sump system, electrical equipment, conduit, and conductors. Additional site work consists of clearing, grading, backfilling, retention pond, asphalt pavement, concrete pavement, various concrete pads, sidewalk, site water and sewer piping, curb and gutter, fence and gates, and various landscaping improvements including irrigation. Selective demolition on site includes specified fencing, gravel, curb, grass, and trees. The existing pump station and reservoir will remain in service.
Morris Electric, Inc. is a seasoned leader in industrial electrical contracting. MEI consistently delivers integrity, greater effectiveness and efficiency in project commissioning and completion. Unlike other electrical contractors, MEI is proactive in every phase of the project resulting in on-time and in-budget performance for the owner.
UPDATE: Bidding Project: WRF SW1 Influent Pump Station
Bids 12/9/2022
Provo Southwest Lift Station
Provo, UT
Santaquin City Hall
Santaquin, UT
JVWCD Chlorination Buildings
Salt Lake City, UT
Sandhollow WTP
Hurricane, UT
Springville WRF 2020 Uppgrades
Springville, UT
DFCM 13.04 Pump Station #1
Salt Lake City, UT
(801) 489-8501 | 275 West 900 North Springville, Utah 84663
Copyright © 2020 All Rights Reserved | Web design and Marketing by i4